
South Wales Mainline Modern
4th September 2023This is an extensive overhaul of DTG’s ‘South Wales Main Line’, including resignalling, new track layouts and electrification as of 2023.
You’ll need the LATEST ATS Common Library and ATS Signal EP Patch installed. (Currently Leeds Lines Merge)
Route Requirements
For the route to function as intended, all the items required below must be installed:
4AS/Cynx
– Signs
Alan Thomson Sim
– Cambridge to Peterborough
– Chat Moss
– WCML Missing Link
– OHLE pack
– Rigid OHLE pack (Freeware)
– BHBP V3 (Freeware – Asset folder TwoCats required only)
Armstrong Powerhouse
– Signal EP
JustTrains
– Southwestern Expressways to Reading
– Western Mainlines
Major Wales Design
– IET markers
Steam
– Birmingham Cross City Line
– Brighton Mainline
– Chatham Mainline
– ECML South
– GEML
– Liverpool to Manchester via Warrington
– Southampton to Bournemouth
– South London Network
– South Wales Mainline
– WCML South
– WCML Trent Valley
– Welsh Marches: Newport – Shrewsbury
Included Scenarios:
Requirements for Adam Haigh’s scenarios can be found HERE: http://alanthomsonsim.com/wp-content/uploads/edd/2023/09/Scenario-Requirements-Adam-Haigh.pdf
1L62 1229 Swansea to London Paddington
Creator: Adam Haigh
Duration: 90 mins
Track covered: Swansea to Bristol Parkway
Year: 2019
2C67 0800 Cardiff Central to Penzance
Creator: Adam Haigh
Duration: 65 mins
Track covered: Cardiff Central to Bristol Temple Meads
Date: 23 June 2021
3Z28 0942 Swindon Cocklebury to Cardiff Central
Creator: Adam Haigh
Duration: 35 mins
Track covered: Bristol Parkway to Cardiff Central
Date: 11 November 2021
—————————————————————————————————————————————-
Requirements for Jonathan Molyneux’s scenarios can be found HERE: http://alanthomsonsim.com/wp-content/uploads/edd/2023/09/JM-SWMM-Requirements.pdf
1B06 08:18 London Paddington-Cardiff Central
Creator: Jonathan Molyneux (Jon180)
Duration: 55 mins
Track covered: Bristol Parkway to Cardiff Central
Date: 8th March 2023
1B24 16:48 London Paddington-Swansea
Creator: Jonathan Molyneux (Jon180)
Duration: 90 mins
Track covered: Bristol Parkway to Swansea
Date: 18th July 2022
1B59 11:04 Carmarthen-Cardiff Central
Creator: Jonathan Molyneux (Jon180)
Duration: 60 mins
Track covered: Swansea to Cardiff Central
Date: 25th February 2023
1L10 07:20 Swansea-London Paddington
Creator: Jonathan Molyneux (Jon180)
Duration: 100 mins
Track covered: Swansea to Bristol Parkway
Date: 6th October 2021
1W13 05:36 Swansea-Manchester Piccadilly
Creator: Jonathan Molyneux (Jon180)
Duration: 60 mins
Track covered: Swansea to Cardiff Central
Date: 17th May 2023
2U14 07:40 Penzance-Cardiff Central
Creator: Jonathan Molyneux (Jon180)
Duration: 80 mins
Track covered: Bristol Temple Meads to Cardiff Central
Date: 18th January 2022
6M51 17:20 Baglan Bay-Chirk Kronospan
Creator: Jonathan Molyneux (Jon180)
Duration: 120 mins
Track covered: Briton Ferry Sidings to Newport
Date: 4th July 2022
Request Permission for Third-party Projects:
If you plan to use any assets from the DC87 and Bilo folders in third-party projects, whether
they are freeware or payware, we kindly ask that you seek permission by reaching out to us
at [[email protected]] We are open to collaboration and sharing, so please feel
free to email us and ask for permission.
Changelog
V1.2.1 – 21/12/2024 – Fixed Bi-Directional Track Issue at Filton Abbey Wood when trying to Access Platform 1 from Patchway/South Wales. (Patch available as Separate Download)
V1.2 – 22/09/2023
● Adjusted size of speed warning board for the 40 MPH towards Dn District (Court Sart
Junction)
● Adjusted size of speed warning board to be smaller approaching Bridgend
● Adjusted size of speed warning board to be smaller approaching Neath
● Added 30 MPH speed board outbound Bridgend (Towards Swansea)
● Added 50 MPH speed board outbound Bridgend (Towards Swansea)
● Added 40 MPH speed board inbound Bridgend on bi-directional line
● Added 40 MPH warning board inbound Bridgend on bi-directional line
● Added 50 MPH warning board inbound Bridgend on bi-directional line
● Added 50 MPH speed board inbound Bridgend on bi-directional line
● Added crossover speed signs for Llynfi junction
● Added crossover speed signs next to Bridgend River Bridge
● Added speed signs for crossover after Pilning station
● Added speed on HUD for Stoke Gifford No.1 Junction
● Added shunt signal at Port Talbot (PT7536)
● Added crossover speed signs for Port Talbot East
● Added crossover speed signs for Margam Moors Junction
● Added 40 MPH warning board inbound Newport on the down relief
● Added crossover speed signs inbound Newport on the reliefs
● Added DVT stop sign board at Port Talbot Platform 1
● Added AWS end signs under Bristol Temple Meads east gantry
● Re-signalled Down OVE/Up OVE
● Changed bridge approaching Bridgend
● Added car park to Bridgend station
● Changed PT3062 to a LED signal instead of ILS
● Improved vegetation around Swansea station
● Improved vegetation/clutter at Filton Junction towards Bristol Parkway
● Improved vegetation/clutter at Cardiff Central eastbound
● Lowered BL1536 BR to match reality
● Fixed disconnected track at Margam Knuckle Yard
● Fixed BL1816 BR repeating incorrectly
● Fixed speed dropping down to 15 MPH when approaching Cardiff Central Eastbound on Line D
● Fixed speed dropping down to 15 MPH when approaching Cardiff Central Westbound on Line C
● Fixed signal SG33 not being visible
● Removed duplicate AWS at Briton Ferry siding
● Removed unwanted scenery, terrain, road, mixmap and loft tiles
● Reworked incorrect terrain and added access point between A473/B4280 roundabout and
Bryn-Y-Gwynon crossing
● Re-signalled and change speeds at Bristol East towards St Annes Park to match 2023
diagrams
● Fixed signal NT1228 showing incorrect indication for specific paths (Up Tunnel, Down Tunnel
& Up Main)
V1.1 – 10/09/2023
● Added missing speed sign to towards Severn Beach
● Added speed warning boards for freight trains inbound Bristol Temple Meads
● Adjusted position for the 40 mph warning boards inbound Bristol Temple Meads
● Changed BL1813 signal to be an ILS signal instead of LED
● Added missing 40mph on Down Filton Relief
● Remove unwanted track tiles
● Fixed routing issue around Dr. Days junction
● Resolved issue with 3Z28 scenario
● Initial clutter/vegetation tweaks at Barton Hill
● Additional vegetation in the Stapleton Road area
● Missing warehouse now added where the Avonmouth branch splits
● Lighting improved at Stoke Gifford Stabling Roads
● Complete overhaul of Stoke Gifford Maintenance Shed
● Added custom signs – removed *James class 37 signs* requirement
● Replaced Gipsy Patch Lane Road (First main road East of Patchway)
● Fixed Gipsy Patch Lane Rail Bridge
● Fixed speed bug around Pengam Up Relief
● Added missing speed board before Lawrence Hill on Up relief
● Added rear clear signs around BTM
● Added rear clear signs after Patchway
● Fixed East Gantry speeds inbound BTM to show speed on HUD
● Add missing speed signs out of Stoke Gifford
● Add missing access point before Stapleton Road (BTM inbound)
● Added custom “Welcome to Wales” sign
● Missing clutter now added Westbound of Patchway Station
● More accurate OHLE in various areas
● Complete overhaul of Bristol Parkway’s parking lot
● New signs and updated lamps added to Newport Station
● Adjustments to resident houses to the right of East Usk yard
● Clean up of Patchway tunnel entrances
● Change track rumble properties for tunnels
● Fixed clipping issues after Neath towards Swansea
There Is A Lot Of Missing Assets On The Route. When I Start The Route From Swansea To Paddington, I Saw A Lot Of Milk Bottles Everywhere On The Route. I Also Noticed That There Were Missing Textures On The Route And Missing Platforms. I Checked The Route With RW Tools, And Thousand Of Assets Were Missing. This Is The Log From RW Tools. A Lot Were Completely Missing.
Have you looked through the requirement list and ensured that you’ve got ALL of the requirements listed?
Hi guys, currently I don’t own Chat Moss or Cambridge to Peterborough so was wondering what I would be missing from this route as a result. Thanks
Hi, you’d be missing a lot of signals, assets unfortunately
An excellent effort by all those involved in modernising this route.
I like some others who have commented have also had some issues with missing signals. The is especially prevalent in a couple of parts of the route. Firstly several signals for me are missing between Bristol Parkway and Newport. Some notable missing signals are those at the entrance to the Severn Tunnel and at the end of the platform at Severn Tunnel Junction. Then between here and Newport it seems to be every other one. All is then fine until around 2 miles outside of Neath and all the way through to the outskirts of Swansea where I have no signals at all but ramps appear in the track and I get a beep from the AWS as if a signal was there.
From looking at the comments elsewhere, I have checked I have the latest version of the ATS Common Library and also the Signal EP Patch installed and as far as I can see the latest versions are installed. In fact if I look on the ATS Installer and pay attention to the routes that I have, all are showing as installed and up to date.
I am therefore not sure what else to try. If anyone has any guidance I would greatly appreciate it.
Hi Mark,
Thank you for the kind words. Indeed, we got reported some signalling issues that people have been facing.
I highly suggest this although I can see that you’ve already tried this
Download latest ATS common library – If you’re using the new ATS installer, delete the Chat Moss route and just redownload the route again.
Once thats done and installed, go to https://alanthomsonsim.com/changelog/ and find ‘ATS Routes AP Signal EP Patch’ and download that and install it (Should be drag and drop)
This theoretically should solve the issue you’re having, I know you’ve tried this before and it wasn’t successful but lets try again and see. Please update me here on how it goes
Hi Elraen,
Thanks for coming back to me on this. I hadn’t completely uninstalled a route, put it back on and reinstalled the signal patch in my attempts to fix it. However, having now installed the latest ATS installer, I have been able to uninstall the chat moss route, reinstall it along with the signal patch from the change log and upon running some tests between Newport and Bristol Parkway, all of the signals appear to now be showing. I still need to run some tests between Port Talbot Parkway, Neath and Swansea where I also had some missing signals but I am not expecting these to be missing any more. I’ll let you know the outcome of these tests between PTP, Neath and Swansea when I get a chance to drive it.
Hi Elraen,
As an update to this now that I have eventually had a chance to drive the route, all previously missing signals are now present on the route having reinstalled the Chat Moss Route as suggested. Thanks again.
Hi I am trying to make a scenario on this route however there is a pathing error where the train cannot go from Patchway to Filton Abbey Wood Platform 1 direct instead it reverses at Bristol Parkway
This problem has been identified and fixed on our internal version. I’d hope to get this out as soon as possible
love the route, but several signal problems at Cardiff (blank signals instead of operating signals) – any advice?
Some catenary issues in places near Llanwern but great job
Hello, this is fantastic!
However, I’m missing some platforms?
Doing the Cardiff to BTM scenario with HST I appear to be missing the Severn tunnel junction platform and the Filton abbey wood one. Don’t think I’m missing any requirements, please advise thanks
thats because you are missing asset items you dont have all the requirements
I just needed to re install South Wales route and the missing platforms are now there.
Thanks anyway
Hi there.
I do have all the requirements listed for this route, but after checking the route with RSTools, i appear to be missing the following.
Assets\ATS\Track_Clutter\Scenery\Clutter\quadrail_1m_red.bin
Assets\ATS\Track_Clutter\Scenery\Clutter\quadrail_2m_red.bin
Assets\Jamesclass37\GWR Station Signs\GWR Bristol Parkway\Main GWR Logo Free Standing\GWR Large.bin
Assets\Jamesclass37\GWR Station Signs\GWR Pilning\Main GWR Logo Wall\GWR Sign.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000006+000092.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000015+000014.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000016+000005.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000016+000009.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000016+000010.bin
Assets\BMG\WelshMarchesLine\Scenery\Treegen\-000018-000002.bin
Could somebody tell me where i might find these items please? Like i say, i have all of the listed requirements for the route, so i don’t know why these would be listed as missing.
Thanks
Terrone.
I have also just discovered that i have got missing textures for the platform edges at Bristol Parkway.
Thanks.
Terrone.
Hi,
Regarding WelshMarchesLine, that should be gone in upcoming patches.
In regards to JamesClass37, you also don’t need to worry about as we don’t use it.
However, the ATS requirements you seem to be missing is cause you haven’t updated your common library – I recommend you follow these steps
You’ll need to have the LATEST common library from ATS (Re-download Leeds Line Merge) then you’ll need to go to to https://alanthomsonsim.com/changelog and then download ATS Routes AP Signal EP Patch
Hi Elraen, thanks for your reply and help.
I have redownloaded the Leeds Merge route and the ATS Signal EP Patch as you suggested, but RSTools is still flagging the above ATS items as missing. I have looked inside the Track_Clutter folder, and indeed there is no quadrail_1m_.bin, or quadrail_2m_Red.bin present. I am stumped!
Also, could you please tell me why i am getting missing textures for the platform edges at Bristol Parkway please?
Thanks Elraen.
Terrone.
Sorry, that should read quadrail_1m_red.bin, not qaudrail_1m.bin. My bad.
Terrone.
Hi again Elraen.
I have fixed it, i needed to delete the Leeds Merge altogether and then do a fresh install of the route, which worked.
It’s just the missing textures on the platform edges at Bristol Parkway that i appear to be missing now.
Thanks
Terrone.
BPW uses assets from either Peterborough – Cambridge or King X – Kings Lynn
No quick drive?
Something we’re working on, should hopefully have quick drives with upcoming patches
Hi, I seem to have an issue with signals. I have signals around the platform at Swansea, but apart from that I have no visible signals on the route. I believe I have all the requirements. Any suggestions? Or which route are the signals from and I’ll try reinstalling that. Thanks
You’ll need to have the LATEST common library from ATS (Re-download Leeds Line Merge) then you’ll need to go to to https://alanthomsonsim.com/changelog and then download ATS Routes AP Signal EP Patch
Hi Elraen, I installed v1.1 yesterday and now scenario 2U14 crashes due to a derailment just short of Patchway station. Please could you look into this? Thanks.
Have you got all requirements for scenario ?
Yes i do Ethan, and the scenario did work prior to installing the upgrade.
Elraen not Ethan ….. apologies.
Stunning route upgrade..
Cheers Simon
Although I have all requirements I downloaded the route with no problems but when I try to run a scenario all I get is the dreaded message Out ofMemory ,I lowered my graphics but no change , can any advise what could be happening to this route ,Thanks Beduth.
Try go into the route via route editor hopefully that would allow you to go in, that usually helps me
Sorry i don`t follow what you mean by route editor , could explain please .
In your train sim classic main menu, press Build then find (ATS) South Wales Mainline Modern, once you click on it press the ‘Edit’ button on the bottom right – once you do that, ‘hopefully’ you’ll see it load without any crashing.
If so press the play button on the right bottom and then press escape and exit to main menu and try loading a scenario back in
Sorry to say your suggestion never worked , ah well ,its just one one of those things .
I think it has been sorted now ( after latest updates) at least I can run the class 70 ( so far )
That should be Class 56 Baglan Bay -Chirk
i would get this but the requirements list is too big sorry i dont have the money
not being rude just i can’t see why you need so much
You’re not being rude, its okay to question these things mate – It was started like this and was too late to go back and change it unfortunately
Unfortunately nothing I can do on my side currently
Had my first run. Really enjoyed it. Fantastic job. For scenario 2C67, I couldn’t let the passengers off at BTM P4, even having shuffled up and down the platform a couple of time.
Thank you for the kind words 🙂 – Still trying to investigate that issue
Hi Elraen its james toyn here your new route is fantastic i really enjoy it. the other thing is i also have the western mainles route as well but i can’t get the same OHLE thats on the South Wales Mainline Modern route western mainles route is it possible to do this and if so how do i do it.
Glad your enjoying it mate – what do you mean ? not sure I understood what you need 🙂
Dear Elraen with this new route i have only got the Arm Reduced of series 1 but nothing eles when this route came out i just wanted to check to see if i am missing something.
What do you mean mate? The way we’ve done the OHLE is by kit bashing it with ATS OHLE
Just done the same scenario. Had the same problem as you…
Have you got all requirements for scenario ?
I have downloaded this, but I’m missing the track got everything else but there seems to be no track but got milk bottles
Can anyone help
All requirements? Have you got unbranded version of South Wales Mainline?