![2H18 09:13 Beckenham Junction – London Bridge 2H18 09:13 Beckenham Junction – London Bridge](https://alanthomsonsim.com/wp-content/uploads/2023/12/2H18-1140x641.png)
2H18 09:13 Beckenham Junction – London Bridge
14th December 2023Drive class 377615 working 2H18 from Beckenham Junction to London Bridge. Taking around 40 minutes. Calling at all stations. It should be a calm run. Based on WTT December 2022.
IMPORTANT: If you don’t want to have the risk of your game crashing (or already crashed). Load any scenario (could be quick drive) on the route, drive a little bit and then load the scenario. This could be due to the route merge not fully optimised.
Date: January 2023
Duration: 40 Minutes
Route: Steam Workshop South London and Thameslink
*Read the manual for more detailed information!*
Requirements:
● Steam Workshop South London and Thameslink
● DTG Chatham Mainline London – Gillingham
● DTG Chatham Mainline to Dover and Ramsgate
● DTG London to Brighton
● DTG South London Network
● DTG Midland Mainline
● DTG ECML South
● DTG Class 465/9
● DTG Class 700
● Thomson WCML Trent Valley
● AP Class 375/377 EP
● AP Class 377/387/379 EP
● AP Class 465/466 Vol. 2 EP
● AP Class 700 EP
● AP Weather EP V2
● Semaphore Sim AP Class 700/707/717 Patch
● Croydon Tram (Optional)
If there are any bugs or feedback, please leave in the comments! I’d really appreciate it!
An excellent scenario thank you
Very good scenario, no stability issue whatsoever 🙂 Thank you for sharing.
Boy does that weather look good, would have been even better with some variable sun IMHO 😉