The Big Freeze (1991) – 5N30 10:10 Oxenholme – Preston [Part 2]

The Big Freeze (1991) – 5N30 10:10 Oxenholme – Preston [Part 2]

22nd April 2024 1 By Harrebarrevarre

The Preston signaller has been informed that the line between Oxenholme and Shap summit will be closed. The OHLE will also be shut down from Hest Bank neutral section due to risk of catenary damage and fallen trees. A maintenance will be sent from Polmadie later today. Just like 1M18 was dragged by diesel power over Shap, you will couple up to the back of the terminated 1S53 to drag it back to the working wires at Preston. You will be working as 5N30.

35 minute scenario for the WCML over Shap. Weather: Heavy snow. Feedback is much appreciated. Hope you enjoy! 😊

Requirements:
(* means it has its own requirements)

AP
Weather EP v2
Signal EP
Class 142 v2
Class 156
Class 37 vol 1
Class 87
Class 90+DVT
Class 31 EP*
Class 56 EP*
Class 86 EP*
Mk1 Coach Pack
Mk2a-c Coach Pack
Mk2d-f Coach Pack
Mk3a-b Coach Pack
BAA/BZA Wagon Pack
FSA/FTA Wagon Pack
MFA/MHA/MTA Wagon Pack
TTA Wagon Pack vol 1

DTG
WCML over Shap

JustTrains
IWB Cargowaggon
ZZA Snowplough

ATS
BodgeItTMDs Virgin Trains West Coast Loco Hauled Pack

DPSimulations
Class 47 ‘Dutch’

Vulcan Productions
BR Mark 3 SLEP Pack