[SR18] 1B25 Waterloo – Poole

[SR18] 1B25 Waterloo – Poole

25th June 2021 0 By SimRacer18

To install the Scenario just copy the Content folder into your Railworks folder.
The Readme file in the download has a copy of the briefing and links to the requirements

This scenario has been tested a few times with no issues found, however if you find any please let me know and I will investigate.

Scenario Breifing:

You are driving 1B25 Waterloo – Poole service taking over at Southampton Central,
There has been a Track Circuit Failure at Ashurst New Forest, S&T has since found a broken IBJ near the area,

This means that Single Line Working has now been implemented between Totton and Brockenhurst,
to make matters worse due to overheating block joints Power Reduction Mode has had to be put in place
between Totton and Brockenhurst also.

You will call addtionally at Totton, where you will be met by your pilotman who will travel with you
to Brockenhurst.

You will also call Addtionally at Ashurst New Forest.

Remember to turn on Power Reduction Mode in your cab as soon as you have stopped at Totton.

Last of all, Do NOT TAB any signals, you shouldn’t need to, you have scheduled wait times at a couple of places
Testing has been done and all signals clear when timed to do so! You have booked wait times at Totton and Brockenhurst.

Good Luck!

Requirements to allow this scenario to function as it should –

Armstrong Powerhouse:

Class 444/450 EP

Class 158/159 (Cummins) EP

AP Common Library (For the AP Blocker Engine) — I believe this is added into most if not all AP Products so everyone should have this.

Semaphore Simulations:

SWR 444-450 Reskin Pack

Requirements which are in the scenario but non essential (Static AI Only) –

Armstrong Powerhouse:

Class 66 Enhancement Pack

FSA/FTA Wagon Pack

DTG Steam Store:

Freightliner Class 70 Loco Add-On