North Somerset Gronk

North Somerset Gronk

8th March 2021 0 By Adam Haigh

Track renewal work is currently underway at Flower Farm, with ballast being transported from a makeshift loading point at Mells Road. You’re in charge of bringing empty hoppers from the worksite at Flowers Farm to Mells Road with your Class 08 loco so they can be refilled with ballast.

25 minute scenario for the North Somerset Railway.

Requirements:
Steam:
– North Somerset Railway.

Armstrong Powerhouse (and their dependencies):
– Class 101/117/121 SP;
– Weather EP.

Major Wales Design (and their dependencies):
– Class 08 Revamp.

It is recommended to have the Wagon (4 Wheel) Sound Pack from AP otherwise your hoppers won’t have any sound. Also, the MJW Class 08 uses the Woodhead in BR Blue 08, and because DTG is too lazy to document the 08 in the manual on how the brakes work, I used the loco brake for stopping. The brake force isn’t too bad.