9K02: 0503 Orpington to Luton (2003)
6th March 2019You will be charge of a Thameslink morning service from Orpington to Luton, starting at St. Pancras Thameslink. The scenario is set in 2003, however it follows the real timetables of the current respective TOCs for 1 May 2019. Please note that this is not meant to be an 100% accurate represenation of the era. Links to all the requirements are included in the readme file.
Route Used:
Midland Main Line London-Bedford
Duration:
50 minutes
Difficulty:
Easy
Requirements:
AP – Class 43 (Valenta)/Mk3 Enhancement Pack
AP – Class 90/Mk3 DVT Pack
AP – Class 319 Electric Multiple Unit Pack Vol. 2
DP Simulation – Class 56 ‘Fastline’
DTG – BR Sectors Class 56 Loco Add-On
DTG – European Loco and Asset Pack
DTG – Midland Main Line London-Bedford Route Add-On
Recommended:
AP – Sky and Weather Enhancement Pack