The East Coast Mainline Merge

The East Coast Mainline Merge

19th January 2019 Off By SpeedyPete202

 

This route is a merge of all the following routes;

The requirements are the above routes and their own requirements. It is strongly advised to run this on the 2019 64 bit (x64) version of Train Simulator

Please note: Those missing RSC\ECMLS\Scenery\Misc\support_post.GeoPcDx, navigate to RSC\ECMLS\RailNetwork\Signals\Pro Signals\Pro Signal Heads and copy the GeoPcDx to the above location.


ABOUT

  • 393 miles of driving between London Kings Cross and Edinburgh Waverley
  • Renewed ground textures in places to overcome a TS bug when merging routes
  • Replaced track to use the RSC ECML South track. This track works on it’s own or with the AP Track Enhancement Pack or Trainworks track upgrades.
  • Some minor scenery improvements along the route
  • Some performance tweaks along the route

Scenarios

  • There will be some scenarios included although given the routes length and time needed to create the scenarios this may be limited to only one or two.

Release date;

  • There is currently no scheduled release date as the route is still a work in progress. Updates will be posted here as they arrive.

Credits

Ash Lightfoot (Lightfoot Productions)
Chris Horsfield (ex CH Scenarios)
Danny Leach of Danny’s Route Pictures
Lewis Clowes (ex Train Sim Designs)

Special thanks to;

Alan Thomson of Alan Thomson Simulation
Alex Ford – Just Trains
Darren Porter DPSimulation
‘Daniel’ of DTG technical support
‘Gptech’ from UKTS Forums
Mark Walker – Vulcan Productions


Picture – Chris Horsfield
Picture editing – Hasan Mulla

Please log in to view this content.

Register | Lost your password?