The Capitals’ Mail (1995) – 1S04 16:33 King’s Cross – Edinburgh [UPDATED]
6th April 2024Couple up to the mail stock at King’s Cross and take The Capital’s Mail as far as Doncaster on the evening journey to Edinburgh. Your traction for this evening is 86208, which is fully owned by RES for mail services, despite keeping the InterCity livery. The ECML is just entering a new era with class 365s being introduced, GNER taking over the InterCity expresses and 325 EMUs entering as new traction on The Capital’s Mail.
Max speed: 100 mph. Timetable:
1633 – London King’s Cross p1 (dep)
1726/1744 – Peterborough p5 (arr/dep)
1841/1900 – Doncaster p8 (arr/dep)
140 minute scenario for the ATS Leeds & York ECML Merge. Weather: Showers to clear. Feedback is much appreciated. Hope you enjoy! 😊
NOTE: I’ve tried to put as much AI in as possible, and I sometimes experienced OOM issues just before Finsbury Park. Make sure to save as you leave King’s Cross just in case.
Requirements:
(* means it has its own requirements)
AP
Weather EP v2
Signal EP
Class 150/2
Class 156
Class 313
Class 317 vol 1&2
Class 37 vol 1
Class 90+DVT
Class 158 Cummins EP*
Class 31 EP*
Class 365 EP*
Class 43 Valenta EP*
Class 56 EP*
Class 86 EP*
Class 91+Mk4 EP*
Mk1 Coach Pack
Mk2d-f Coach Pack
Mk3a-b Coach Pack
BAA/BZA Wagon Pack
FSA/FTA Wagon Pack
MGR Wagon Pack
TIA-Y Wagon Pack
DTG
WCML over Shap
JustTrains
VGA
Cargowaggon IWB
ATS
Rail Express Systems Postal Pack (with extra stock)
Leeds & York ECML Merge
Hi
I don’t gat any clashes, but I do get the broken consist found (the same as Jonathan). I can’t even get out of the loco shunt neck at King’s Cross as the route is set for the loco sdg! Tried uninstall/reinstall a number of times without any joy!
Just for your information:
I had to delete the 1S33 train from the schedule and as for the broken consist, I replaced both the Class 156 and the ICS IC225 train at Grantham station and the scenario now seems to run ok (to set back into Kgx platform 1 I need to [Ctrl/Tab} to get the ground position light at the tunnel mouth to clear)
Hi, I replaced the consists at Grantham (see previous reply I made) to depart the siding wait for a couple of minutes for a 91/Mk4 to arrive at Kgs from gasworks Tunnel then the signal changed allowing me to head into the tunnel.
Ok, thanks for the feedback guys. I dont get this fault so its hard for me to fix. My tip would be to remove 1s33 and see if that solves it.
Same here, I have all requirements
These are the errors:
Broken consist found: -0.648975 52.909126
1N06 – Unable to resolve clash – 1S33
1S04 – Unable to resolve clash – 1S33
1S33 51.53144 -0.12319 – Many failures
1NO6/1S04/1S33. A broken consist was also listed, checked in RWTools, nothing showing. Had all requirements.
I had the same problems as Ryan.
Hi tried playing this tonight had 3 AI load up in Errors with pathing issues and coudlnt get any further than Gasworks Tunnel. Tried re-installing the route which hasnt help either.
Hi, could you tell me which 3 AI had errors? And do you have all requirments?
Hi there someone else has listed the same as me above and yes all requirements are in.