ATS Sub: SWML Modern ‘Tunnel Vision’ Scenario Pack

£0.00

You need the proper subscription plan to be able to purchase this product.
Get a discount on this product by purchasing a subscription. 
SKU: 1PSW-3680393 Categories: , Tags: , , ,

Description

Much of the South Wales Main Line was built between the 1830s and 1880s, originally trains to and from England ran via Chepstow, eventually joining the Great Western Main Line at Swindon. A more direct route was needed, leading to the construction of the Severn Tunnel which was completed in 1886.

Fast forward to the 21st century and the line between Swindon and Cardiff Central was electrified, as part of a wider scheme for the Great Western Main Line. This permitted the operation of electric traction between Cardiff and London, these services commencing in 2020.

In various iterations, the route from Bristol to Cardiff and Swansea has been a popular choice in Train Simulator Classic and the South Wales Mainline Modern route has brought it right into the present day.

This pack contains six scenarios for the ATS South Wales Mainline Modern route, concentrating on the eastern half between Bristol and Cardiff and covering operations from the summer of 2022 – adding over five hours of driving time to the sim.

Scenarios

[ATS-SUB4] 1F13 1030 Cardiff Central – Portsmouth Harbour

Track Covered: Cardiff Central to Bristol Temple Meads

Traction: Great Western Railway 165130/166201

Year: 2022

Duration: 55 Minutes

 

[ATS-SUB4] 1F30 1824 Portsmouth Harbour – Cardiff Central

Track Covered: Bristol Temple Meads to Cardiff Central

Traction: Great Western Railway 158760/158745

Year: 2022

Duration: 60 Minutes

 

[ATS-SUB4] 2C81 1500 Cardiff Central – Taunton

Track Covered: Cardiff Central to Bristol Temple Meads

Traction: Great Western Railway 43154/43027

Year: 2022

Duration: 65 Minutes

 

[ATS-SUB4] 5A04 0540 Stoke Gifford Depot – Bristol Temple Meads

Track Covered: Stoke Gifford to Bristol Temple Meads

Traction: Great Western Railway 800318

Year: 2022

Duration: 30 Minutes

 

[ATS-SUB4] 6Z86 1541 Stoke Gifford – Machen Quarry

Track Covered: Stoke Gifford Yard to East Usk

Traction: Freightliner 66504

Year: 2022

Duration: 50 Minutes

 

[ATS-SUB4] 9B04 0712 London Paddington – Cardiff Central

Track Covered: Bristol Parkway to Cardiff Central

Traction: Great Western Railway 387155/387166

Year: 2022

Duration: 50 Minutes

 

Requirements:

ATS:

ATS Routes AP Signal EP Patch

Class 165/166 DMU Pack

Northern 158s Reskin by Clowes*

South Wales Mainline Modern Route*

 

Armstrong Powerhouse:

Class 150/2 DMU Pack

HST (MTU) Pack

JSA Wagon Pack

Class 66 EP 2.0 Volume 1*

Class 158/159 Cummins EP*

Class 168/170/171 EP*

Class 175 2.0 EP*

Class 377/379/387 EP*

Class 800-803 EP*

Container Wagon EP Volume 1*

Wagon (Modern) Sound Pack**

Signal EP

Sky Weather EP 2.0

 

Just Trains:

Class 220/221 Voyager

 

Steam:

Freightliner Class 70 (for the Oovee MJA/TEA wagons)

 

TS Rolling Stock:

HTA Wagon Pack

*Note that these products have their own individual requirements.

**Non-essential though highly recommended.