(RW) 1A43 Holyhead – London Euston
2nd August 2026Route: North Wales Coast Revamped (part 1), ATS WCML Midlands & North West (part 2), WCML Trent Valley (part 3) and ATS WCML South + Northampton Loop (part 4)
Player train: 221 143
Track covered: Holyhead to London Euston
Duration: 220 minutes
Date: Summer 2016
Difficulty: Very Hard (4/5)
Brief: It’s a wonderful summer day in Anglesey and you’re tasked with taking 1A43 all the way to London Euston; calling at Bangor, Llandudno Junction, Colwyn Bay, Rhyl, Prestatyn, Flint, Chester, Crewe and Milton Keynes Central. You’ll attach to 221 102 at Chester to strengthen your service for the rest of the journey to London. There are no network issues to report.
Warning!
Part 4 is extremely resource intensive. Please load the attached Free Roam and follow the instructions before playing.
Requirements:
Armstrong Powerhouse
~ AP Class 66 2.0
~ AP Class 67
+ MJW ATW Class 67/Mk3s
~ AP Class 90 Freightliner
~ AP Class 150/2
~ AP Class 168/170/171
~ AP Class 175 2.0
~ AP Class 220/221 (essential)
~ AP Class 314/315
+ AP Class 313
+ Class 507/508 Reskin
~ AP Class 319 Vol 1
~ AP Class 350
+ Class 350 Improvement Patch
~ AP Class 378
~ AP Class 390
+ MJW Class 390 Revamp Pack
~ AP FSA Wagons
~ AP HKA Wagons
~ AP JNA Wagons
Alan Thomson Sim
~ Alex55 WCML South
+ Virtual District Line
DTG
~ DTG Cross City
+ Oli35 Class 323 Northern Rail Reskin
Installation guide:
Copy the ‘Content’ folder into your ‘Railworks’ folder.





A most enjoyable 4 part scenario, Thank you.