
(JR) 5Q54 15:52 Norwich C.Pt. T&R.S.M.D. – Hornsey E.M.U.D.
28th April 20255Q54 15:52 Norwich C.Pt. T&R.S.M.D. – Hornsey E.M.U.D.
Briefing
755416 is off on a trip to the wheel lathe at Hornsey Depot and you have been booked to take the unit from Ely to Hornsey, running via Cambridge and the ECML. Following the crew change at Ely, we have no other planned stops on our way to Hornsey. At the moment there are no issues to report, but that could change. Year = 2021
How to install
1. Extract using zip or 7zip
2. Copy Contents folder into Railworks folder.
3. Done!
Route: (ATS) Kings Cross – Kings Lynn (Cambridge to Peterborough)
Duration: 100 minutes
Requirements
Armstrong Powerhouse
BR Mk3*
Class 91 EP
Class 170 EP
Class 377/379/387 EP
Class 317 Vol.2
Class 365 EP
Class 700 EP
Class 800 EP
MTU HST Pack*
Cloud EP*
Weather EP*
ATS
Class 755
InterCity 225 LNER/VTEC Pack
Sun Deflection Great Northern Class 365 Reskin
DTG
Chatham Mainline (For AP 377/379/387 EP)
Class 91 (For AP 91 EP)
Class 170 (For AP 170 EP)
Class 180
Class 465 (For AP 365 EP)
Class 700 (For AP 700 EP)
Class 801 (For AP 800 EP)
ECML South (For AP 365 EP)
Major Wales
Class 180 revamp pack
Semaphore Simulation
AP Class 700/707/717 EP Patch 1.2
LNER Azuma Reskin Pack 1.1
Vulcan Productions
Class 170 Air Dam Pack
Anything marked with * is optional. The scenario will still run without these!
I believe that is everything. If there is anything missing or you have any issues please do let me know and I will do my best to fix the issue. Other than that I hope you enjoy this scenario!
Lovely scenario! Thanks for your work.