[ir]wacky workings
18th December 2020hello driver and welcome to wacky workings. based back in 2014, a 20 was dragged in to replace a 37 before one arrived to replace a 37.
requirements:
ap:weather ep, 20sp, 37 vol 1, mk2d, 170ep, 153sp,158 perkins+cummins
steam:20,170,159,170,geml 90
just trains:153
mjw:153 revamp
instalation instructions:simply drag the downloaded file into your railworks folder.
any ai i have missed in the manual, please put as comments.
enjoy
Hi again Isaac, The problem was that an Al – Norwich to Cambridge Platform alteration, was just leaving platform 5 and crossing my path at the time that I was due to arrive in platform 4 at Norwich. By the time I got the RA I was 2 mins late arriving.
Hi Isaac, I believe that I did, but not sure. Will run the scenario again and let you know. It’s not the end of the world is it, just me that likes to get a “Scenario Complete”. I don’t want to cause you any extra work, and if nobody else has reported the same issue.
no one else has reported this issue, can rectify/try my best to if you want
Nice scenario Isaac, but please let me have a moan. I like no doubt many others, having carried out the scenario creator’s instructions correctly like to obtain a “Scenario Complete”. In this scenario having arrived at a red signal just outside Norwich, the signal not changing to amber until AFTER the scheduled arrival time. Consequently a 2 minute late arrival and “Scenario Incomplete”. I am at a loss as to why scenario creator’s do this. But Thank you, as apart from this I enjoyed the drive.
hi, sorry about this, never encountered this during test. did you try tabbing the signal? because it might be one of those issues