Fife Circle Line: Phase 1 Electrification

Fife Circle Line: Phase 1 Electrification

30th July 2025 0 By Hamish Corr

** This is NOT a realistic representation as there are no wires installed yet. It is just the construction of stanchions and some drop bars that are in place at the moment ** This update adds realistic overhead line equipment to a section of the Fife Circle line between Haymarket and Dalmeny, as is currently being constructed.

***Requirements***:

  •  Fife Circle Line: Edinburgh – Dunfermline Route Add-On
  • Glasgow to Dunblane and Alloa Route Add-On