Fife Circle Line: Phase 1 Electrification
30th July 2025** This is NOT a realistic representation as there are no wires installed yet. It is just the construction of stanchions and some drop bars that are in place at the moment ** This update adds realistic overhead line equipment to a section of the Fife Circle line between Haymarket and Dalmeny, as is currently being constructed.
***Requirements***:
- Fife Circle Line: Edinburgh – Dunfermline Route Add-On
- Glasgow to Dunblane and Alloa Route Add-On




