[CB] 1T50 17:48 London Kings Cross – Kings Lynn
14th April 2026Traction –
379022+020+018
Brief –
You are rostered with taking the second 12-carriage Class 379 evening peak services from London Kings Cross to Kings Lynn. You call at: Letchworth Garden City, Royston, Cambridge (where you detach from the rear 4 carriages), Cambridge North, Waterbeach, Ely, Littleport, Downham Market, Watlington and Kings Lynn.
Requirements –
~ ATS’ Kings Cross to Kings Lynn Route
+ Armstrong Powerhouse’s Class 168/170/171 Enhancement Pack
+ Vulcan Production’s Class 168/170/171 Airdam Patch
+ Armstrong Powerhouse’s Class 377/379/387 Enhancement Pack
+ Ash992478’s ‘The Govia Thameslink Railway Robbery’ Reskin Pack
+ Armstrong Powerhouse’s Class 700/707/717 Enhancement Pack
+ AzeezSim’s Class 700/707/717 EP Patch
+ Armstrong Powerhouse’s Class 800-803 Enhancement Pack
+ AzeezSim’s Class 803003 Lumo Reskin
Difficulty & Duration –
1 Hour 55 Minutes | Medium





I’ve tried to run the scenario, but it starts with many errors, seemingly about missing markers. I can start the scenario, but just before Litchworth the scenario ends with two AI trains colliding. I have all the necessary rolling stock. Do you have any idea what the problem could be?
Never mind, apparently there has been an update to the route without me realizing. Just reinstalled and everything is looking good now 🙂