
9G33 12:19 Bedford – London St Pancras International (2022)
17th March 2022On Sunday 13th March 2022, Engineering work closed the Thameslink Core through London. As such, Thameslink trains over the MML started/ended their journeys at St Pancras Mainline Station instead of the normal Thameslink Station. Take over the controls of 700014 at Bedford and operate service 9G33 all the way into London.
Requirements:
Steam
– MML London St Pancras – Bedford
– GEML London – Ipswich*
– Chatham Mainline London Victoria to Dover & Ramsgate*
– Class 700
Armstrong Powerhouse
– Class 700 Enhancement Pack
Just Trains
– Class 222*
Semaphore Simulations
– Class 170/222 EMR Reskin (only for the 222) *
Alan Thomson Simulation
– Class 360 EMR Connect*
*- denotes non-essential
^- denotes that this piece of DLC has its own requirements. It is essential that you have these requirements for the AI to show correctly in the scenario.
To install, copy the ‘Content’ folder into your main Railworks folder.
Any feedback is really appreciated 😊 Enjoy!
I really enjoyed playing this scenario keep up the good work
Thanks for the feedback – it’s greatly appreciated 🙂