6F88 12:00 Sutton Oak to Arpley Sidings (2000)
9th January 2025In the last years before the closing of the Hays Chemicals plant, a trip working from Ravenhead with sulphuric acid fed into the EWS Enterprise network at Warrington. You will drive 6F88 on 11th August 2000 between Bamfurlong Junction and Arpley Sidings, where you will have to shunt into the yard.
The scenario is based on the original 2000 WTT. A schedule card is included in the download (serves for reference purposes only). I recommend you to play in 64bit-mode only due to the amount of ai-trains.
Route: ATS West Coast Mainline Midlands and Northwest
Track covered: Bamfurlong Jn to Arpley Sdgs
Duration: 30 min
Month/Year: 08/2000
Start Time: 12:30
Difficulty: medium
Player train: Class 56 AP
Additional information: Watch out for red signals due to fast passenger services. There’s no [TAB] required. Please remember that your speed limit is 60 mph.
Requirements:
Routes:
· ATS West Coast Mainline Midlands and Northwest
AP:
· Class 37 Vol. 1+2
· Class 31 EP*
· Class 56 EP
· Class 86 EP
· Class 90/Mk3 DVT Pack
· Class 90 (Freightliner) Pack
· Class 142 (2.0)
· Class 156
· Class 325 EP*
· Mk2D-F Coach Pack
· MGR Wagon Pack
· BAA/BZA Wagon Pack
· FSA/FTA Wagon Pack
· JSA Wagon Pack
· TIA-Y Wagon Pack
· AP Signal EP
· AP Sky & Weather EP 2.0*
· AP Track EP*
+all essential requirements
ATS:
· Virgin Trains West Coast Loco Hauled Pack
· ATS/Imbue Rail Express Systems Postal Pack*
· GOLD STAR TRAINS® Plasser & Theurer 09 Series Ballast Tamper Pack*
JT:
· Class 60 Advanced
· VGA/VKA Wagon PlusPak*
MJW:
· Class 08 Gronkpack
TS Rolling Stock:
· JNA/PXA Wagon Pack
DTG:
· BR Class 31 Freight*
· BR Railfreight OTA Wagon*
· Huddersfield Line: Manchester – Leeds Route Add-On*
*optional
Great scenario, Thank you.
Thank you, Benelena! Glad you enjoyed it!
An excellent scenario! Thanks for sharing 🙂
Thank you, Frankoi1337! glad you enjoyed it!