5Q43 0900 Laira T.& R.S.M.D. to Mid-norfolk Railway Siding

5Q43 0900 Laira T.& R.S.M.D. to Mid-norfolk Railway Siding

20th February 2026 2 By Jamez130

With GWR withdrawing all their HST sets, they are being put into storage until their future is decided. You are to drive the final set to leave Laira depot by rail, you will drive from Peterborough to Ely North Junction.

Date: 17/02/2026

Duration: 45 Minutes

Route: Cambridge – Peterborough

Traction: 2+6 HST Set

 

Requirements: (Some Requirements have their own Requirements)

ATS Cambridge – Peterborough

AP HST (MTU)

AP Class 170 EP

Clowes Ex- TFW (EMR) 170

AP Class 800 EP

AP Class 66 EP 2.0 Vol 1

AP Wagon EP

AP HIA Wagons

ATS Class 755

 

Static AI: (Not Required, but recommended)

AP Class 66 EP 2.0 Vol 2

ATS IIA-F Wagons

AP JNA-T Wagons

TSRS HTA Wagons

HTA Branding Patch

 

Recommended:

AP Sky & Weather EP

AP Cloud EP

AP Sky Accurate Time of Day

 

Notes:

  • 2 Scenarios have been provided, 1 with & 1 without static AI for those with less powerful computers.
  • This Scenario features A rolling start.
  • This has been routed through platform 6 instead of platform 7, as the track layout in TS makes it impossible to be routed through platform 7 without reversing.