3Y81 0534 Heaton T&R.S.M.D. – Middlesbrough / 1Y81 0735 Middlesbrough – London Kings Cross
6th September 2026Start at Sunderland with 3Y81, the ECS working to Middlesbrough. On arrival, form 1Y81, the daily LNER service from Middlesbrough to London King’s Cross. Work the train south as far as York, where another driver will take over.
Â
Date: 24/07/2026
Duration: 130 Minutes
Route: North East England + Durham Coast Line
Traction: LNER Class 800210
Â
Requirements: (Some Requirements have their own Requirements)
Â
Static AI: (Not Required, but recommended)
Â
Recommended:
Â
Notes:
- You may need to TAB signal G735 when approaching the reversing point, but not until after 2D03 has passed.
- After passing G735, you’ll encounter an un-signalled crossover with a 20 MPH speed limit.
- The actual reversing point is just beyond the end of the scenery, with no signals beyond this point. For this reason, the reversing point has been moved forward by one junction.





Fabulous scenario, Thank you.
Thank you, you’re welcome.