1T31 11:49 Bedford to London St. Pancras c2011

1T31 11:49 Bedford to London St. Pancras c2011

7th June 2020 0 By Cactus732

During major engineering works on the Thameslink Core, weekend services on the Thameslink route were terminated short of the core at London Bridge in the South and London St. Pancras in the north. You will be in charge of the 11:49 First Capital Connect service from Bedford to the Capital.

Scenario Route: MML St. Pancras to Bedford
Scenario Length: 1hr

Requirements

AP Class 375/377EP
AP Class 150/1 EP*
AP Class 319 Volume 1 and 2
AP VP185 HST EP
AP Class 66EP
AP JPU Wagon Pack
AP JNA Wagon Pack*
Steam London to Faversham Highspeed*
Just Trains Meridian

*=Optional static AI not required for full senario functionality