1S25 2035 London Euston to Inverness
14th January 2026Work on the West Coast has meant that the Caledonian Sleeper High and Lowlander serveries are being diverted via the East Coast. After departing Euston the train has come over the North London Line and is sat at a signal awaiting the road onto the East Coast at Camden Junction. You will drive this service as far as York today where it will make an additional service stop for a crew change. Your traction is a class 92 locomotive with a rake of MK5s behind. Year 2026.
Requirements:
Armstrong powerhouse:
– Class 43 MTU;
– Class 66 EP V2;
– Class 91 EP;
– Class 92 EP;
– Class 150/2;
– Class 387 EP;
– Class 700 EP;
– JNA-T Wagon Pack;
– Container EP;
– Weather EP;
– Signal EP.
Alan Thomson Simulation:
– Leeds Lines Merge;
– MK5 Sleeper Coaches;
– Class 379 Great Northern (ex-GA);
– VTEC / LNER Class 91 Pack;
– Class 185.
TSRollingStock:
– PNA Wagons Pack.
Semaphore Simulations:
– 700 EP Patch.





brilliant scenario, any chance of the continuation
Could look into it, however the AI would be bare as hell.
Excellent scenario mate