1N67 Oxford – Bristol Temple Meads
26th May 2026Drive the full length of 15:04 1N67 Oxford – Bristol Temple Meads via Bath Spa. Today you will be driving GWR’s newest service as of the May 2026 timetable change. This 2 hourly service connects Oxford to Bristol Temple Meads via Swindon, running as an express service. You will be calling at: Oxford, Swindon, Chippenham, Bath Spa and Bristol Temple Meads. Enjoy this new 75 minute run connecting these two historic cities.
Route: Western Mainlines Electrification to V2 to Bristol & Chippenham By Desiro2019
Requirements:
Armstrong Powerhouse:
– Class 158/159 (Cummins) Enhancement Pack*
– Class 220/221 Enhancement Pack*
– Class 377/379/387 Enhancement Pack*
– Class 800-803 Enhancement Pack*
– JNA-T Wagon
– Cloud Enhancement Pack*
Alan Thomson Sim:
– Class 165/166 DMU by ATS
– Western Mainlines Electrification to V2 to Bristol & Chippenham* By Desiro2019
– Class 80x Extra Equipment & Visuals Patch* By Watson PD
To save this list from being even longer, everything marked with an * uses its own requirements, which are essential for this scenario to run properly.
To install this scenario: download and extract the file, copy the contents folder over to your railworks folder, and overwrite any files it prompts you to. After that, clear your cache and then you will be able to access all scenarios.
Enjoy!




