1N26 11:27 London King’s Cross to Sunderland (2010) Part 2

1N26 11:27 London King’s Cross to Sunderland (2010) Part 2

13th August 2021 0 By Cactus732

After the long nonstop, mostly 125mph, run from London to York you rejoin 43084 at York and will be driving the rest of the way to Sunderland at a much more sedate pace along the Durham Coast line.

Scenario Route: DPS North East England
Scenario Length: 90 Minutes

All passenger AI is from the 2010 working timetable, Freight is from 2011 due to the relevant 2010 timetable not being available on the Network Rail Archive

Requirements:

AP Valenta HST EP
AP MTU HST EP
AP Class 66EP
AP Class 91EP + James Ivell (ATS) Class 91 improvement patch
APW Class 142 + Majorwales Class 142 revamp pack
AP Class 156
GBRf HYA Coal Hopper UKTS File ID. 21457
Fullersim (ATS) Class 185 2.2.1
JT Class 60 Advanced + BHreskins Class 60 reskin pack
JT Voyager