1N26 11:27 London King’s Cross to Sunderland (2010) Part 2

1N26 11:27 London King’s Cross to Sunderland (2010) Part 2

13th August 2021 0 By Cactus732

Share this

After the long nonstop, mostly 125mph, run from London to York you rejoin 43084 at York and will be driving the rest of the way to Sunderland at a much more sedate pace along the Durham Coast line.

Scenario Route: DPS North East England
Scenario Length: 90 Minutes

All passenger AI is from the 2010 working timetable, Freight is from 2011 due to the relevant 2010 timetable not being available on the Network Rail Archive

Requirements:

AP Valenta HST EP
AP MTU HST EP
AP Class 66EP
AP Class 91EP + James Ivell (ATS) Class 91 improvement patch
APW Class 142 + Majorwales Class 142 revamp pack
AP Class 156
GBRf HYA Coal Hopper UKTS File ID. 21457
Fullersim (ATS) Class 185 2.2.1
JT Class 60 Advanced + BHreskins Class 60 reskin pack
JT Voyager