1G96 17:52 London Blackfriars to Bedford (2007)
16th August 2024Hello! This is one scenario for AP’s wonderful ‘MML London to Bedford (Enhanced)’ route…
DESCRIPTION: Plans to reconstruct London Blackfriars station as part of the ‘Thameslink Upgrade Programme’ are well underway, and it’s not long before the station is closed for these works. In the final weeks of through operation, take control of a pair of Class 319s on the peak time additional from Blackfriars through to Bedford, from Kings Cross Thameslink. Year: 2007
TRACK COVERED: Kings Cross Thameslink to Bedford
TRACTION: Ex-Thameslink (First Capital Connect) 319365 & 319366
DURATION: 60 Minutes
DIFFICULTY: Medium
CONDITIONS: Summer, Cloudy
REQUIREMENTS:
PAYWARE:
STEAM:
• Class 66 EWS
•Class 66 Freightliner
• London to Bedford BedPan
ARMSTRONG POWERHOUSE:
• Class 43 (Valenta)/Mk3 Enhancement Pack
• Class 43 (VP185)/Mk3 Enhancement Pack
• Class 66 Enhancement Pack
• Class 319 Electric Multiple Unit Pack Vol. 2
• Cloud Enhancement Pack (Optional)
•JGA-K/PHA Wagon Pack
• MML London to Bedford Enhancement Pack
• Signal Enhancement Pack
• Sky & Weather Enhancement Pack (Optional)
JUST TRAINS:
• Class 222
FREEWARE:
ALAN THOMSON SIM:
• Class 222 EX-MML
MAJOR WALES:
• Class 43 Revamp Pack
• Class 66 Freightliner
UPDATE LOG: Nothing yet! (16/08/2024) …and that’s it for this scenario. My other creations can be found here. Anyway, enjoy! 🙂
Excellent scenario indeed. Thanks!
Another fantastic scenario. AI, adverse signals, weather. Everything about it was great.