WCML Midlands & Northwest Update to v1.0.4
11th August 2019This download has been updated.
The following things have been fixed;
- Fixes around the Crewe area
- Removal many asset blocks from the Ditton area to help with performance
- Updates to scenarios
You can download the update from your account page
Can someone give me some help please. trying to download WCML Midlands and Nortwest v1.0.4 Loging in to ATS installer after run as admin i get LOGGED IN – Railworks Folder Invalid. many Thanks
make sure you have a space before “(x86)” in the railworks path. Its daft that this has to be typed in each time. Talk about un user friendly!
My first run today Stafford to Liverpool, the route looks great, you have put in a lot of work, thank you.
One or two issues, about 15 miles from Crewe the track ballast was moving forward against the side of the track correctly moving backwards, this happened several times.
Hartford station platform was missing on both sides of the track and pulling out of Runcorn the track was floating.
It could of course be my system causing these problems but I thought it was worth mentioning.
Hi, I am sorry that I am still getting this – Correction of starting direction of QD (Quick Drive) markers. For me still the wrong way round.
Going round in circles – from my Account page cannot see a link to download Update
if you redownload the route, it will be the updated version.
Shane
Thanks very much for the update 🙂
yy